ENERGY AND ECOLOGY EQUIPMENT

Constant rise in price of the petroleum products on the internal and external markets forces the enterprises to search for paths of cost-saving of production. Important component of the product cost for enterprises is the electric power.

The cost-effective and easy-to-maintain, 30KW - 1MW power output, Automation Level I, II, III gas-piston power stations offer the optimum solution to meet the on-site operational demand for low-cost electric power and heat supply.

With the use of the Russian-built gas-piston power stations, the electric power generation, transmission and consumption processes take place directly on your operational premises. This advanced approach affords a considerable reduction of the electric power cost, thus ensuring a lower overall product cost and boosting the profitability level of your production operations.

The gas-piston power stations run on such fuel types as the pipeline gas, pit methane, associated petroleum gas (with 20% minimum methane content, or up to 0.2% maximum mass content of hydrogen sulphide).

 

Specifications
AGP-
30S-
T400-1R
AGP-
60S-
T400-1R
AGP-
100S-
T400-1R
AGP-
150S-
T400-1R
AGP-
200S-
T400-1R
AGP-
250S-
T400-1R
AGP-
315S-
T400-1R
AGP-
350S-
T400-1R
Rated power (continuous),
kW / kWA
30/37,5 60/75 100/125 150/187,5 200/250 250/312,5 315/394 350/476
Maximum one-hour rating,
kW / kWA
33/41,25 66/82,5 110/137,5 166/206,25 220/275 275/343,75 346/471 385/524
Ampere rating, A 54 108 180 270 360 450 570 630
Cooling system 17 36 36 36 60 70 85 85
Lubricating system 12 34 34 34 34 33 50 50
Specific fuel
consumption at rated
power, m3/hour
15 24 35 35 70 87,5 112,2 125,2
Specific oil consumption,
% from a fuel consumption
0,5 0,5 0,5 0,5 0,5 0,5 0,5 0,5
Overall dimensions,
mm (length, width, height)
2360
960
1310
2271*
1040*
1145
2450*
1040
1145
2760
1342
1625
2865
1233
1175
2910
1172
1720
3450(3025)
1300(1600)
1700
3450(3025)
1300(1600)
1700
Mass of dry electrical
unit, kg
1300 1800 2050* 2600 2700 3150 4000 4000
Guaranteed operating
time, m. hours
3000 3000 3000 3000 3000 3000 3000 3000
Overhaul life, m. hours 10000 10000 16000 20000 16000 20000 20000 20000

 

31-Inshatchilar Avenue; Baku, Azerbaijan
Phone: +994212 5108788; Fax: 5107576; Email:operation@uis.az;
mpe@aigcc.com